APPENDIX
Block A – Forming of 2nd slab, Iron work, Electrical and Mechanical installation completed
Block B – Forming of the third slab ongoing at block B.
WORK SUMMARY
BLOCK A
- Forming of second slab, Iron work, Electrical and Mechanical installation completed.
BLOCK B
- Casting of extension column at third floor completed.
- Forming of the third slab ongoing at block B.