APPENDIX

Block A – Formwork to third Floor completed.

Block B – Formwork to roof beam ongoing.

WORK SUMMARY

BLOCK A

  • Formwork to third Floor completed.
  • Ironwork and plumbing / Electrical on going.

BLOCK B

  • Third suspended slab casted.
  • Extension column casted.
  • Form work to roof beam ongoing.

THANK YOU.