APPENDIX
BLOCK A
- External Electrical Piping down (external). 95%
- Formwork and Shuttering of Third Floor Extension Column. 100%
- Roof Beam Formwork and Shuttering 90%
- Concrete Casting to Roof Beam Formwork (In view).
BLOCK B
- Formwork and shuttering to Second Floor Slab 100%
- Slab Reinforcement Arrangement (Laying and Tieing) 100%
- Concrete Casting to Second Floor Slab 100%
- Blockwork on Second Floor slab 20%
BLOCK C
- Slab reinforcement arrangement (Second Floor) 100%
- Concrete Casting to Second Floor Slab 100%
- Blockwork on Second Floor Slab (In View)
BLOCK D
- Blockwork and Partition wall on Third Floor Slab 100%
- Roof Beam Formwork and Shuttering (In View).
BLOCK E
- Formwork and Shuttering for Third Floor Slab 90%
- Reinforcement to Third Floor Slab (In View).
SUMMARY OF STATE OF WORK
- Roof Beam Formwork and Shuttering 90% (Block A)
- Formwork and Shuttering of Third Floor Extension Column 100% (Block A)
- Formwork and Shuttering to Second Floor Slab 100% (Block B)
- Slab Reinforcement arrangement (Laying and Tieing) 100% (Block B)
- Slab Reinforcement arrangement (Second Floor) 100% (Block C)
- Concrete Casting to Second Floor Slab 100% (Block C)
- Blockwork and Partition Wall on Third Floor Slab 100% (Block D)
- Reinforcement to Third Floor Slab (In View). (Block E)
THANK YOU.