SITE ACTIVITY REPORT FOR THE MONTH OF JULY 2021 (CEDARWOOD CITY, ABUJA)

APPENDIX Picture showing the Screeding level on Lot 15   Retaining wall by the river ongoing   Picture showing the Screeding level on Lot 14   LOT 11- Reinforcement work completed   Lot 12- Copping 100% done   Picture showing Soakaway between Lot 8 [...]

SITE ACTIVITY REPORT FOR THE MONTH OF JUNE 2021 (GLENDALE PEARL, ABUJA)

APPENDIX Picture showing the Roofing on Block A   Picture showing Blockwork and Reinforcement to extension column on Block B.   Picture showing Blockwork on third-floor slab on Block C.   A Picture of Block D   Picture showing roof beam and parapet on Block E. [...]

Go to Top