SITE ACTIVITY REPORT FOR THE MONTH OF MAY 2021 (GLENDALE PLUS, ABUJA)

PICTORIAL VIEW OF GLENDALE PLUS STATE OF WORK APPENDIX PICTURE SHOWING COMPLETED WALL PAINTING ON BLOCK A   PICTURE SHOWING A COMPLETED WINDOW HOOD AND WALL BELT FITTINGSAT BLOCK B.   PICTURE SHOWING COMPLETED WALL PAINTING ON BLOCK C   PICTURE SHOWING BLOCK D   [...]

SITE ACTIVITY REPORT FOR THE MONTH OF APRIL 2021 (CEDARWOOD CITY, ABUJA)

Phase 1 Report APPENDIX LOT 11- Reinforcement work completed Lot 12- Parapet wall is 100% done. Picture showing the bridge Picture showing the Park. Picture showing water Fountain Picture showing the Gatehouse WORK SUMMARY LOT – 7: Window dressing and divider Wall [...]

SITE ACTIVITY REPORT FOR THE MONTH OF APRIL 2021 (GLENDALE PEARL, ABUJA)

APPENDIX PICTURE SHOWING BLOCK A PICTURE SHOWING BLOCKWORK ON SECOND FLOOR SLAB AT BLOCK B PICTURE SHOWING CONCRETE CASTING TO SECOND FLOOR SLAB AT BLOCK C PICTURE SHOWING BLOCKWORK AND PARTITION WALL ON THIRD FLOOR SLAB AT BLOCK D PICTURE SHOWING FORMWORK AND SHUTTERING FOR [...]